• Step 1
    Step 1
    Digging a trench with a mini trencher for perimeter insulation.
  • Setting Foam
    Setting Foam
    Here the crew is setting foam precisely into the trench using a laser level.
  • Roof Beam
    Metal ring beam which the roof bolts to being fastened to the top of the post pair assemblies.
  • Main Slab
    Ready to Pour
    In floor heating is installed and the main slab is ready to pour. Note: The central sitting pit in this design is custom and not normally done because of high cost.
  • Woodhenge
    Woodhenge!!!
    Circular post pair assembly's created. These posts will support the roof.
  • Bale Bottom Ladder
    Bale bottom ladder
    Here the bale bottom ladder is built by attaching it to vertical post.
  • Roof Erection Begins
    Roof Erection Begins
    All scaffolding and supports in place for roof erection next day.
  • Roof Erection Begins
    First five rood sheets in place to secure exact position and leveling.
  • 8hrs later
    8hrs later roof sheet installation finished.
  • Bails
    Bales now being installed in the addition part of the house using a large enforcer.
  • Happy Camper
    One happy builder peering through the raw skylight opening.