• Setting Foam
    Early stages of foundation construction showing 6 inch terrafoam perimeter insulation installed.
  • Roof Beam
    Ready for concrete pour.
    Note: 6 inch perimeter foam insulation being utilized as concrete forms.
  • Step 1
    Post and beam structure up and ready for roof trusses.
  • Main Slab
    Corner post and beam details showing everything including bottom bale ladder up to top wall beam.
  • Bale Bottom Ladder
    Bale work completed in garage. No stucco wire used. Note: diagnal 2x4 bracing used for alignment for bale walls.
  • Roof Erection Begins
    Strawbale work just finished under galvanized garage roof.
  • Roof Erection Begins
    Final bale being cut for installation.
    Note: Vertical brace used for corner bale alignment.
  • Woodhenge
    This framing view highlights a door frame fastened to the bottom bale ladder.
  • Bails
    Corner bracing removed after first coat of stucco.
  • 8hrs later
    Corner bracing will be removed after first coat. See close up of next photo.
  • Happy Camper
    Close up showing penetration into non-wired straw bale wall showing excellent penetration.