-
Back wall now ready for bale work. -
Bale squeezed in tight between window frame. -
Installed bale insulation above window frame. -
Bales are stacked vertically between 2x8 posts. -
Eve view of finished bale work showing completed sophet details. This is a japanese plum blossom motif in the eve support. -
Bale work completed and ready for stucco. -
Interior bedroom wall ready for stucco. -
Stucco patch up here. -
Same window/wall after second scratch coat. -
Interior wall completed. -
One happy camper!
